A supplier can provide a genuine safety report that does not answer the buyer’s actual question: does it cover this charger, with this suffix, plug and port configuration? Authenticity concerns whether evidence is genuine. Applicability concerns what that evidence covers. Neither follows merely from a familiar laboratory name on a report cover.
Use the following matrix to prepare a document-applicability review before purchase or sample acceptance. It is an original procurement tool, not an official certification checklist. No real charger certificate or supplier report was authenticated for this article; only the issuer and qualified reviewer can resolve actual coverage.
Identify the purchased variant, not just the series
Begin with photographs of the intact sample and label, the purchase description and the supplier’s configuration statement. Record the full model string, including punctuation and suffixes; plug type; enclosure and port arrangement; declared input/output ratings; and sample reference. Keep unknown fields visibly unresolved instead of filling them from a similar product listing.
Record the applicant, manufacturer and certificate holder as each document states them. Different names require an explained relationship, not an automatic accusation. Preserve the original wording alongside any normalized search term so a later reviewer can reconstruct the comparison.
For earlier product screening, use the basic charger selection and input-range guide. The task here is narrower: determine whether evidence presented for an already-selected variant is actually applicable.
Join three records in one scope matrix
Keep one matrix row for each identity or scope field. Copy exact wording before deciding whether two entries mean the same thing. The cells below identify what to collect; they are not populated results from a real certification review.
| Field | Sample or order record | Report or addendum | Certifier record |
|---|---|---|---|
| Full model and suffix | Complete label string | Named models and suffix rules | Exact listed model or linked scope |
| Plug and market | Received plug; intended market | Evaluated variants and restrictions | Applicable market scope, where shown |
| Enclosure and ports | Photos and configuration reference | Described construction and variants | Relevant product entry |
| Input/output ratings | Declared label ratings | Ratings within evaluated scope | Compare ratings if listed |
| Responsible parties | Supplier and declared manufacturer | Applicant and manufacturer | Holder and explained relationships |
| Standard and edition | Requested compliance claim | Exact edition and evaluated scope | Applicable certification scope |
| Family differences | Purchased variant reference | Tested sample; permitted differences | Linked models or certificates |
| Mark and status | Claimed mark, if present | Report reference, not assumed certificate | Official entry, status and retrieval time |
Add a report revision and page or addendum reference to each comparison. Retain the directory URL and retrieval date, the observed wording, an exact-match/explicit-difference/unresolved flag, and the clarification reference. Give each unresolved row an owner and closure authority. These fields make the matrix a working record rather than a collection of reassuring screenshots.
A public directory may not display every construction detail. Record “not displayed” accurately and seek the relevant controlled evidence; do not treat an empty public field as either approval or rejection. A cropped report cover cannot replace the pages that define model differences, exclusions or tested construction.
Read each program’s guidance within its own scope
TÜV Rheinland’s Certipedia guidance directs users to check a test mark’s unique ID or QR-linked entry, including product name, model and certificate excerpt. It describes a unique Single ID for each test mark certificate and says multiple certificates can be grouped under a Parent ID under certain conditions. A grouped entry therefore calls for checking the assigned certificate and product scope; it does not establish that every similar-looking variant is covered.
Intertek’s ETL Listed Mark FAQ describes independent testing and periodic follow-up inspections as part of what certification marks demonstrate. It also directs readers to its listed-product directory. A one-off test report should not be presented as interchangeable with that certification process. Ask which certification claim is being made and which current record supports it.
UL Solutions’ Follow-Up Services guidance describes factory inspections that check whether the manufactured product is the same as, or meets the requirements of, the original evaluation. It says manufacturers must be able to verify construction against the Follow-Up Service Procedure, and that materials and components are checked against their descriptions in those procedures. This is UL’s own certification-program guidance, not a universal purchasing rule. It does not establish that any offered charger or differently suffixed variant has UL Certification.

Turn a mismatch into a question, not a safety verdict
Hold the unconfirmed coverage claim while the designated owner resolves it; do not label the product unsafe or counterfeit from a missing field alone. The following dispositions concern document applicability, not permission to market the charger.
| Finding | Documentary disposition | Evidence to request |
|---|---|---|
| Exact variant is explicitly traceable | Submit the crosswalk for qualified confirmation | Referenced pages, entry and reviewer decision |
| Series matches but suffix, plug or enclosure differs | Hold variant coverage | Explicit family-difference scope or issuer clarification |
| A referenced addendum is missing | Leave affected rows unresolved | Complete controlled addendum and revision relationship |
| Directory entry is absent or ambiguous | Record the search and ask the issuing body | Official clarification of identifier, status and scope |
| Evidence covers a component only | Do not describe it as finished-charger certification | Applicable finished-product documentation |
Searching again with the correct identifier may resolve a clerical mismatch. If it does not, use the issuing body’s official contact route rather than relying solely on a supplier-forwarded assurance. Directory absence alone is not proof of fraud. Equally, a search hit is not enough if its model or market scope does not match the claim being reviewed.
Ask for an answer that can be archived
Frame the request around one unresolved row: identify the purchased configuration, quote the conflicting wording, name the report revision and page, and ask which document explicitly connects them. Request the relevant full report pages or addendum, model-family explanation, certification status and applicable market/standard edition. Avoid a vague request to “send all certificates,” which can produce more files without closing the identity gap.
Retain the issuer’s response with its date, reference and the qualified reviewer’s disposition. A useful closure says which variant and claim were confirmed, on what evidence, and what remains excluded. Matrix completeness is not itself authentication, a safety pass, or proof of charging performance.
If the enquiry concerns a ChargeKeku sourcing option, request exact-model report references with the target market, complete model and unresolved fields. This is a documentation request, not a promise that any particular certification is held.
Hand later substitutions to change control
Once an offered variant has been reviewed, a proposed component, firmware or construction change becomes a different task. Transfer it to the component-change and requalification decision log with the original scope references attached. This matrix does not prescribe new tests or decide that retesting can be omitted. Qualified engineering, compliance reviewers and the issuing body determine the applicable next steps.
Sources
- TÜV Rheinland — Certipedia database and test-mark guidance — model/entry verification and conditional Parent ID grouping.
- Intertek — ETL Listed Mark frequently asked questions — certification process, follow-up inspections and directory guidance.
- UL Solutions — Follow-Up Services: Ongoing Onsite Certification Inspections — original-evaluation and documented-construction consistency within UL’s own program.