A fictional dispatch file contains an approved state assessment for one production cohort. The final cartons contain that cohort plus units from another preparation run, and a later top-up appears in the event log. The original assessment may be genuine, yet its applicability to this dispatch remains unresolved. Neither a familiar lot name nor a fresh cover sheet closes those gaps.
This original documentary method connects three things: an approved requirement and evidence method, the units actually represented, and subsequent events before handover. It reviews existing authorized records, not how to charge, discharge, store or transport a battery. A complete reconciliation is not permission to ship.
Choose the requirement before accepting a reading
IATA’s 2026 Battery Guidance Document classifies power banks as batteries within its air-transport framework. It separately defines indicated remaining usable capacity and state of charge relative to rated capacity. Do not assume an equipment-oriented display recommendation applies to a power bank. The guide expressly says it should not be relied upon as a source of regulatory compliance.
The PHMSA Lithium Battery Guide for Shippers, revised October 2024, is historical context here. It organizes scenarios by battery type and configuration, defers to the actual Hazardous Materials Regulations, and discusses current modal, State and carrier conditions. It is not a verified statement of all applicable rules for a shipment today.
Have the responsible qualified reviewer identify jurisdiction, mode, route, operator, product configuration and the current controlling requirement, edition and addenda. Record the required quantity and evidence basis, not a percentage copied from another order. The UN38.3 test-summary importer checklist already covers design-type mapping and shipment-specific review; this article adds event-to-population reconciliation rather than repeating that checklist.
Make each handoff carry an identifiable object
Define a cohort as the explicitly identified units grouped for this record, not simply everything sharing a commercial model name. Retain the approved SKU, battery configuration, hardware and firmware references, production/storage lot relationships and the membership record used at preparation. Do not invent serial ranges when the available records identify cartons or another controlled unit set.
IATA’s supply-chain discussion distinguishes manufacturer, shipper and freight-forwarder responsibilities. The following three desks are proposed internal record owners, not a reassignment of those legal responsibilities.
| Record owner | Object handed over | Boundary to preserve |
|---|---|---|
| Production | Cohort membership and authorized preparation/storage event references | A model or lot label is not a complete dispatch population |
| QA | Dated assessment, approved method and represented-unit scope | Sample evidence does not automatically cover every unit |
| Dispatch review | Actual manifest revision, carton membership and intervening events | A changed consignment needs explicit reconciliation |
For a split, link each child subset to the parent population and its applicable evidence. For a mixed carton, retain each contributing cohort’s identity. A common carton number does not erase different preparation histories. Unrepresented units remain a visible gap, not an inferred average.
Preserve the meaning of the state evidence
TI’s Impedance Track algorithm report, SLUA364B, revised December 2006, describes a historical component example using chemical information, resistance, load and temperature. Its reported relative state of charge uses estimated remaining and full-charge capacities; its voltage correlation uses chemistry-specific data. This is not evidence of a ChargeKeku component, calibration result, accuracy guarantee or approved transport-verification method.
Keep the displayed observation separate from the quantity accepted under the approved method. Ask for the denominator, configuration, method revision, assessment time and time zone, represented units or sampling scope, and applicable uncertainty or limitations. A differently normalized estimate cannot be relabeled as the required quantity without the qualified method owner’s justification. Where that mapping is missing, preserve the uncertainty instead of supplying a conversion.
The separate SOC-indicator acceptance method owns display/reference qualification. Here, retain its approved method reference where applicable; do not recreate a test protocol or assume that passing an indicator assessment establishes shipping-state compliance.

Reconcile the event ledger against actual dispatch
Use one ledger row for an identified cohort, an event or assessment, and its dispatch assignment. The fillable companion record connects the manifest revision, product configuration, requirement approval, state quantity, method reference, assessment coverage, later events and authorized disposition. Repeat linked rows for splits or rework rather than overwriting the original population.
Compare the assessment time with the latest relevant intervention and the dispatch review time. An assessment predating an authorized top-up or relevant rework needs an applicability decision for the affected units. An assessment occurring later does not automatically prove coverage, method validity or acceptable state. Timestamp ordering is a question generator, not a physical-state model.
Preserve storage entry/exit and delay records so the qualified owner can apply the approved validity or reassessment rule. If that rule is absent, request disposition; do not invent an expiry period or self-discharge correction. A route change can reopen the requirement review without changing the physical assessment. Keep that regulatory-scope question separate from evidence of a state-changing operation.
At handover, reconcile against the actual dispatch membership, not the original purchase quantity or planned carton mix. Keep superseded records, unresolved subsets, the responsible reviewer and the evidence supporting each documentary disposition.
Use six fictional cases to expose different gaps
All six cases below are fictional. These are documentary dispositions, not battery findings, mandatory regulatory forms or permission to perform an operation.
| Fictional file | Documentary response | Conclusion withheld |
|---|---|---|
| Only a display photo | Request quantity, method approval and represented-unit scope | The display is wrong or the shipment is compliant |
| A later authorized top-up | Preserve the earlier assessment; reopen applicability for affected units | The old record still establishes the required state |
| Mixed cohorts, evidence for one | Map both memberships and retain the unresolved subset | One cohort’s evidence covers every carton |
| Dispatch delayed after storage | Apply the approved validity rule or request disposition | A universal expiry or calculated correction |
| Route, mode or operator changed | Reopen the applicable-requirement review | Approval transfers unchanged to the new route |
| All record links reconcile | Close only the documentary reconciliation | Transport authorization or product certification |
Keep a documentary hold distinct from a finding that a battery is unsafe. Conversely, an actual adverse finding must reach the responsible safety or transport reviewer; it must not be renamed a missing-paperwork issue. The qualified decision should identify its scope and supporting evidence, not merely replace an open flag with “passed.”
For a ChargeKeku enquiry, discuss a shipment-bound charge-state evidence packet with the intended route, configuration, actual unit set, method and latest events. This requests documentation, not a logistics service or transport approval.
Do not open packs, access cells, force discharge, bypass protection or change gauge settings to fill this record. Physical preparation and any suspect-battery decision belong to the responsible qualified process. This article supplies no charge-state target, storage condition, handling recipe or release authority.
Sources
- IATA — Battery Guidance Document, revised for 2026 regulations, dated 1 January 2026, introduction and printed pages 5, 6 and 13: guidance limitations, definitions and supply-chain responsibilities; not a regulatory-compliance source.
- PHMSA — Lithium Battery Guide for Shippers, revised October 2024, introduction and international/modal discussion: historical guidance, subordinate to controlling regulations and shipment-specific review.
- Texas Instruments — Theory and Implementation of Impedance Track Battery Fuel-Gauging Algorithm in bq20zxx Product Family, SLUA364B, revised December 2006, sections 1, 2.2 and 2.7: historical algorithm context, not finished-product accuracy or a shipping-state method.