In a fictional drawing exchange, a buyer marks the two outer plug-tip planes. A supplier marks where the jacket leaves the strain reliefs. Both call their dimension “cable length.” Before deciding whether a shipment is short, they must select one dimension. Averaging the two interpretations would not settle the disagreement.
Treat the package’s nominal length as a statement to reconcile with the purchase requirement, not a complete measuring instruction. The sketches and decision aid below are original proposals, not product observations. None of the cited metrology sources establishes a universal USB cable endpoint, tolerance or retail-labeling rule.
Redline the surfaces, not just the word length
VIM, JCGM 200:2012, defines the measurand as the quantity intended to be measured. Its notes address relevant object state and the possibility that measurement changes that object. It also identifies uncertainty arising from finite detail in the definition. For this dispute, an ambiguous endpoint needs a better drawing, not merely a finer scale.
Name both endpoint surfaces rather than pointing vaguely at each plug. Mark whether metal tips, overmolds and strain-relief portions are included. Specify a straight-line distance, a projection or a stated routed path. A right-angle or coiled construction may need a different sketch; do not silently reuse the straight-cable illustration.
Keep installed reach and internal conductor-path length outside this external dimension unless separately defined. A photo can locate a datum, but an attractive product photograph is not an approved dimensional drawing. Record the drawing revision and have buyer and supplier reviewers resolve differences before comparison.
Agree the unpacked condition
GUM, JCGM 100:2008, corrected in 2010, starts measurement with the quantity, method and procedure. The detail needed in the definition depends on the required accuracy. Its uncertainty discussion includes imperfect realization, environmental effects, reading, resolution and sampling. Those principles support specifying relevant conditions; they do not supply default cable temperatures or waiting times.
On the drawing card, state the package condition, permitted unpacking, support, orientation, slack handling and relaxation or stabilization criterion. Record what actually happened. If a preload is required, its value and application method belong to the approved procedure; none is assumed here. Do not hand-pull the cable until the reading becomes acceptable.
NPL’s Good Practice Guide 80, in its October 2012 reprint, discusses rule-reading parallax and precision-tape conditions, including sag, tension and temperature. The tape’s calibrated tension concerns the measuring instrument: it is not a prescribed tensile load on the cable. Keep that distinction in the work instruction. Check the instrument’s identification, calibration or verification, reference/zero condition and reading geometry under the chosen method.
Put one definition card beside the observations
Resolve the card before approving a comparison. The compact fields below are prompts, not default settings or a mandatory standard form.
| Card block | Agreement to record | Missing information means |
|---|---|---|
| Product and dimension | SKU, connector variant, drawing revision, endpoint A and B surfaces, included parts and path | The intended quantity is unresolved |
| Physical condition | Unpacking rule, support, orientation, slack or specified preload, stabilization criterion | The realizations may not be comparable |
| Measurement system | Instrument ID, verification, resolution, zero check, alignment and reporting units | The reading lacks a defined method |
| Decision authority | Product limits, uncertainty treatment, rounding, sample/retest plan and reviewers | The disposition rule is unresolved |
Keep the observations separate from this common definition. Use one row for one physical unit, one dimension and one planned repeat. Identify lot, carton, unit, population and selection plan; record the distinct-unit count. Repeated readings from one cable do not create additional sampled cables.
Each row should retain the card revision, package state and unpacking time, actual conditions, operator, observation time and repeat ID. Record both raw endpoint readings where the method uses them, followed by the reported length, units and corrections. Retain the sketch or photograph locating the datums and the calculation trail. Keep sample disposition and any authorized retest separate from the lot-disposition owner and remaining coverage gap.
Choose the borderline policy in advance
NPL distinguishes scale resolution, designer-set tolerance limits and measurement uncertainty. A small scale division is not the product tolerance, and neither is an uncertainty statement. Put the actual lower and upper product limits on the card; a nominal label alone does not provide them.
For reporting, GUM recommends enough information to reconstruct the result and uncertainty, including components and corrections. When expanded uncertainty is used, its reporting guidance includes the factor, approximate confidence level and how that level was determined. Record the uncertainty type, value and basis rather than an unexplained plus-or-minus number. No default factor or confidence percentage is assigned here.
One optional, explicitly pre-agreed rule could require the interval [y−U, y+U] to lie within [L_low, L_high]. Here y is the reported estimate, U is a justified expanded uncertainty, and the limits are product requirements in the same units. Under that selected rule, an interval wholly inside the limits supports the stated sample decision. This is an illustrative contract choice, not a GUM or USB mandate or a guarantee about the true value.
If an interval overlaps a limit, use the previously agreed borderline, escalation or authorized-retest policy. Do not erase uncertainty, shift the limit or pronounce every overlap an automatic failure. If the decision policy was never agreed, leave that decision unresolved rather than choosing a favorable rule afterward.

Return the redline with a precise question
Use this dispute desk before repeating observations. The situations are hypothetical, not measured ChargeKeku results.
| Disagreement | Question to resolve | Next disposition |
|---|---|---|
| Tips versus jacket exits | Are the surfaces and included parts identical? | Agree one drawing; do not average unlike dimensions |
| Supported versus hand-pulled cable | Were physical conditions the same? | Keep both records; repeat only under an authorized common condition |
| Reading near a limit | Which uncertainty and borderline policy applies? | Apply the declared rule or escalate the decision |
| Many repeats, one unit | What population did the distinct units represent? | Report the sample limit; use the separate lot plan |
| Length accepted, performance requested | Was any functional property measured? | Close only the dimensional question |
The existing guide to how cable length affects charging performance handles the functional question. Likewise, the separate connector-durability inspection plan addresses mechanical qualification. Neither decision follows from this external length record. Do not cut open a cable or improvise an electrical or pull test to settle it.
For a ChargeKeku enquiry, request a drawing-backed cable length agreement. Send the label wording, SKU and drawing revision, marked endpoint surfaces, agreed conditions, limits and per-unit observations. Ask the responsible reviewers to reconcile the dimension first, then apply the separate sample and lot decisions. This is an evidence request, not a promised custom tolerance or testing service.
Sources
- JCGM / BIPM — International vocabulary of metrology, JCGM 200:2012, third edition: entries 2.3, 2.24 and 2.27; quantity, conditions and definitional uncertainty, not a cable endpoint rule.
- JCGM / BIPM — Guide to the expression of uncertainty in measurement, JCGM 100:2008, corrected version 2010: selected measurement and reporting guidance, not a prescribed cable tolerance or decision rule.
- National Physical Laboratory — Fundamental Good Practice in Dimensional Metrology, Guide 80, October 2012 reprint: selected dimensional practice and instrument conditions; no cable preload or current universal conformity rule.