A charger indicator lights up after a supply disturbance, but the connected device still is not charging. That is a recovery question, not a successful restart report. For purchasing acceptance, ask what happened to the complete charger, cable and device combination. A returning AC waveform, a restored USB voltage and a charging device are different observations.
First decide whether interruption is permitted
Uninterrupted ride-through and restart are different requirements. Ride-through means the agreed service remains available throughout the disturbance. Restart allows an interruption followed by recovery under stated conditions. A successful restart does not satisfy a requirement for uninterrupted charging. Conversely, continuous operation should not be reported as a fast restart when nothing restarted.
Write the allowed interruption, recovery endpoint and observation window into the purchase agreement before testing. Do not substitute a universal millisecond target. If the requirement is autonomous recovery, define which actions are prohibited: unplugging the cable, cycling the AC again, pressing a device button or changing a software setting. Log every intervention, including an action that appears harmless.
Record four milestones, not one indicator
Use this worksheet to distinguish the evidence channels. They are not guaranteed to produce four new events in a fixed sequence: VBUS or an existing contract may survive a disturbance, while a non-PD operating case has no PD contract to re-establish.
| Milestone | Evidence to retain | What it does not prove |
|---|---|---|
| AC return | Rated-source record and agreed confirmation at the charger input | The output or device has recovered |
| VBUS available | Output voltage record at the declared USB measurement plane | The required operating contract or charging state exists |
| Required PD contract | Protocol record showing retained or re-established contract; not applicable where agreed | The device is actually charging |
| Device charging | Agreed device telemetry and corroborating input record over the observation window | Uninterrupted operation before this observation |
The USB Type-C specification, Release 2.5, separates attachment, VBUS and PD behavior. Section 4.5.2.2.9.1 describes Attached.SRC requirements, including VBUS provision and waiting for vSafe5V before initiating PD communications. Section 4.6.2.4 requires operationally stable VBUS before PD communications at attach. These are attachment requirements, not a complete AC-brownout recovery test or a promise that every disturbance creates a new attachment.
For a timing claim, identify the reference event and each endpoint explicitly. Report clock alignment and timing uncertainty rather than subtracting unrelated screenshots. Where a state was retained, label it retained. Where evidence is absent, label it unknown. Device input current alone is not conclusive battery-charging evidence; agree which device status or telemetry establishes the intended charging state.
Controller features explain mechanisms, not product results
Texas Instruments’ UCC28740 datasheet discusses separated line run/stop thresholds and a UVLO reset/restart sequence for its fault-protection events. Its startup description also distinguishes charging the controller supply capacitor from charging the output capacitor. This explains why a controller restart mechanism deserves investigation; the document does not establish the purchased charger’s restart delay, disturbance tolerance or device compatibility.
TI’s UCC28780 product documentation lists brownout detection and internal soft start. Those are component features, not evidence that a particular finished charger uses that part or meets a recovery requirement. Do not transfer controller pin thresholds into an AC-input acceptance limit. Neither example establishes a universal mains threshold, an IEC immunity level or a guaranteed recovery time.
Commission a closed-system laboratory test
Use a qualified laboratory with suitably rated programmable AC equipment, protected instrumentation and an approved risk assessment. Keep the charger enclosure closed. This article is an evidence request, not instructions for probing mains, bypassing protection, opening a charger or improvising a disturbance generator. The laboratory owns equipment selection, safe connections, operating limits and stop conditions.
Keep ports, cables and devices unchanged during each disturbance case. Initial energization peaks belong to an input-inrush report review, not this recovery decision. Multiport insertion/removal and PPS setpoint sweeps also answer different questions; do not add them silently to the same run and then attribute the outcome solely to the AC disturbance.
- Define the service requirement. Record whether the application needs ride-through or restart, its allowed interruption, the charging endpoint and the stability observation window. Require the buyer to supply acceptance limits and the laboratory to document its uncertainty decision rule. No numerical limit is supplied here.
- Freeze the initial condition. Identify the sample and revision, AC source, cable, device and firmware, selected output profile, all port states and thermal condition. Record device charge state and a stable baseline. A device already choosing not to charge cannot demonstrate resumption without an appropriate agreed preparation.
- Approve the disturbance matrix. Give each case a unique identifier, specified input reduction, duration, return condition and initial-state requirement. Use only levels approved for the application and equipment. Keep case severity separate from the recovery outcome; an unspecified “brownout test” cannot support a purchasing comparison.
- Capture synchronized evidence. Record the source event, VBUS, protocol activity where applicable and device charging status on a documented time basis. Keep the original traces, sampling configuration and synchronization evidence. Record whether each state was interrupted, retained, recovered or not observable.
- Observe without rescuing the run. Maintain the agreed setup through the observation window and log instability or repeated restart attempts. If manual intervention becomes necessary, mark its time and preserve the pre-intervention record. An assisted recovery must not replace the original autonomous-recovery result.
- Investigate and disposition. Retain all repeats and deviations. A controlled comparison with a known-good charger, cable or device can help locate the failure boundary, changing one item at a time. Keep these diagnostic runs separate from the original acceptance run and its requirement decision.

Make the disposition match the requirement
A case identifier should join the approved input condition, sample state, four-channel evidence and decision. Compare suppliers only within matched cases. The following outcomes describe proposed purchasing dispositions, not actual product findings.
| Recorded finding | Proposed disposition | Evidence needed next |
|---|---|---|
| All required observations satisfy the agreement | Accept only the tested case and configuration | Traceable raw records and signed laboratory result |
| VBUS returns but charging does not resume | Hold system-recovery acceptance | Device/protocol evidence and controlled comparison |
| Manual action is needed despite an autonomous requirement | Record the requirement failure | Root-cause response and separately identified retest |
| Timing channels cannot be aligned | Hold the numerical recovery claim | Synchronized captures and timing uncertainty |
Do not average a failed case into a passing headline or delete an assisted run after a successful repeat. Keep the device model, firmware, sample revision and disturbance conditions attached to the conclusion. A different configuration needs its own applicability decision; one tested pairing is not evidence for every charging device.
For broader product selection, use the wall-charger buying guide alongside this narrower recovery record. Send an OEM sample-evidence enquiry with the intended devices, operating states and buyer-approved recovery requirement. Request the complete case matrix and unresolved deviations, not only a video showing that the charger turns back on. This acceptance record does not establish safety certification or EMC immunity compliance.
Sources
- USB-IF / USB 3.0 Promoter Group: USB Type-C Cable and Connector Specification, Release 2.5, March 2026, sections 4.5.2.2.9.1 and 4.6.2.4.
- Texas Instruments: UCC28740 datasheet, SLUSBF3D, revised March 2018, startup and fault-protection mechanisms.
- Texas Instruments: UCC28780 product documentation, brownout detection and internal soft-start features; maintained-page date unknown.