A supplier sends a screenshot showing “PPS supported” and a phone displaying fast charging. Is that enough to approve an OEM charger? No. It establishes neither how accurately the charger follows a requested voltage nor whether the result holds across the operating conditions you intend to buy.

A useful PPS acceptance report connects three records: what the charger offered, what the test sink requested, and what the instruments measured. Keep them separate, then compare them under a written acceptance rule. This guide explains that report structure; it does not certify a product or report measurements of any ChargeKeku charger.

Define the claim before choosing test points

Programmable Power Supply is an optional USB Power Delivery feature, not a promise that every connected device will charge at the same speed. For the protocol background, see our USB-C PD vs PPS guide. Here, the purchasing question is narrower: does the proposed charger deliver the agreed programmable output reproducibly?

Ask the supplier to identify the exact model, hardware revision, firmware or configuration revision, physical port, and advertised PPS ranges. Record each PPS Augmented Power Data Object, or APDO, rather than transcribing only the largest wattage on the enclosure. Include any stated current, power, temperature, and simultaneous-port restrictions.

Select only operating points valid for that advertised capability and the connected cable. Do not combine a maximum voltage from one offer with a maximum current from another and assume the resulting point is supported. The supplier should resolve ambiguities before sample approval.

Do not confuse request increments with accuracy

Renesas’ USB PD technical overview describes PPS voltage changes in 20 mV steps and current changes in 50 mA steps. Those figures describe programming increments. They are not universal output-error limits, instrument specifications, or guarantees about the voltage reaching a phone.

Texas Instruments makes the distinction visible in its TPS25762-Q1 electrical-characteristics table: output-voltage step size, regulation accuracy, current-limit step size, and current-limit accuracy are separate entries with stated conditions.

That automotive controller is an engineering example, not evidence about the components or performance of a ChargeKeku wall charger. Do not copy its limits into a finished-product purchase specification. Require the supplier to state the applicable product limits and their measurement conditions.

Make the requested and measured quantities explicit

A PPS current request and an electronic load setting serve different purposes. The negotiated current concerns what the source is asked to make available; the load determines the current actually drawn during the test. A lightly loaded source should not be judged defective because it supplies less than the negotiated current.

For voltage-regulation checks, define the sink request and a load condition that stays below the relevant current limit. Treat current-limit behavior as a separate test. Otherwise, an intentional transition into current limiting can be misreported as poor voltage regulation.

Use a qualified laboratory with a suitable PD analyzer or programmable sink, calibrated voltage/current measurement, and a rated electronic load. Keep the charger enclosure closed. Mains-side connections and input-condition control belong to qualified personnel using approved equipment, not improvised probing.

Fix the measurement point before comparing reports

A reading at the charger receptacle is not automatically equivalent to a reading after the cable, analyzer, and load fixture. Resistance in that path can change the voltage delivered to the load. Record the sensing location, cable identity, fixture, and any compensation settings.

TI’s output-voltage and cable-droop-compensation description provides a useful caution: compensation behavior is configurable in that device and is disabled by default during PPS contracts. This is a device-specific implementation, not a rule for all chargers. Ask the supplier what the finished product actually does.

Where the test plan needs both source-side regulation and delivered voltage, report both, with clearly labeled sensing points. Do not subtract an assumed cable drop or compare a source-side supplier result against an unlabeled buyer-side reading.

Conceptual USB PPS test path with source- and load-side voltage sensing, an actual-current meter, PD sink and electronic load.
Voltage at the source receptacle and at the load are different sensing locations. Record the intervening cable, instruments, fixture and compensation settings. Single-line conceptual view; return path omitted. Not product measurements.

Build a small, traceable operating matrix

Begin with a manageable set of legal points across each required PPS range, including its agreed boundaries and intermediate points. Add the load conditions relevant to the intended devices. The buyer and supplier must define exact setpoints, sample count, repetitions, stabilization rule, and observation window; this article does not prescribe universal values.

For each row, retain:

  • Product identity: sample number, lot, hardware revision, and firmware/configuration revision.
  • Operating state: input conditions, ambient, warm-up state, active ports, and cable/fixture identifiers.
  • Protocol evidence: advertised capabilities, requested operating point, and whether the intended PPS contract was established.
  • Electrical evidence: actual current, measured voltage, sensing point, instrument settings, and raw record location.
  • Decision: applicable limit, measurement uncertainty, observed result, and reviewer disposition.

Repeat selected points after the agreed warm-up condition. If output capability changes with temperature, relate the finding to the charger thermal-derating test rather than silently comparing a cold sample with a warm one.

Separate steady-state errors from transitions

A single meter value can show neither settling behavior nor a brief interruption. For planned voltage changes, preserve the protocol timing alongside a suitable output capture. Report the requested change, observed response, and the rule used to determine when the steady-state measurement begins.

Do not average a transient into the steady-state accuracy result. Equally, do not discard a repeated disturbance simply because the final reading looks acceptable. Define transition limits and the treatment of unexpected resets before testing; unexplained events need investigation rather than a retrospective exception.

For this setpoint test, keep other ports in a declared, unchanged state. Adding or removing devices is a separate power-sharing scenario. If simultaneous use is required, repeat the setpoint checks in each agreed stable port configuration without presenting that as a complete hot-plug qualification.

Turn missing evidence into a clear decision

A report may justify acceptance for the tested scope, rejection against an agreed limit, or a hold because evidence is insufficient. Missing sensing locations, unidentified firmware, or a phone screenshot without a protocol record should trigger clarification—not an invented pass.

Define how measurement uncertainty affects decisions near a limit. Keep the original result and explanation when a test is repeated. If a different cable or fixture removes the discrepancy, document the changed variable rather than deleting the first run.

Finally, distinguish procurement testing from certification. The USB-IF testing index separates physical-layer, protocol, and power-supply coverage and identifies approved test solutions. A supplier setpoint sweep covers only its declared scope; it is not a substitute for the applicable USB-IF compliance program or product-safety evaluation.

Procurement checklist: what to request with samples

Before approving the proposed model, obtain:

  • A version-controlled PPS capability list and operating restrictions for every required port state.
  • A legal setpoint/load matrix with buyer-approved limits and uncertainty rules.
  • A setup diagram identifying the voltage-sensing points and all cable/fixture elements.
  • Matched protocol logs and electrical records, not screenshots selected without context.
  • Separate steady-state, transition, and current-limit results where those claims are required.
  • A sample-level disposition and a change-control trigger for affected hardware, firmware, or configuration revisions.

For an OEM charger enquiry, send ChargeKeku this checklist alongside the target devices, markets, and required port combinations. Ask for a testable specification and evidence for the proposed SKU. A clear acceptance record is more useful than an unsupported “PPS compatible” label.