A charger component change is a configuration decision, not merely a purchasing substitution. Two parts with similar catalogue descriptions may differ in ways that matter to the finished product. The buyer needs a traceable decision about what changed, which evidence remains applicable and where the new configuration begins.

A minimum decision record that survives handover
Use one record containing change ID, affected SKU and configuration, old and new references, proposed lot boundary, affected claims, required evidence, reviewer, disposition and closure date. Link the evidence rather than replacing it with a sentence saying all tests passed. If commercial urgency creates a request for an exception, record who has authority to grant it and which requirements cannot be waived by that commercial decision.
Before closure, ask whether remaining old stock and incoming new stock can be distinguished in the agreed records. A sample-based review does not establish the composition of unidentified mixed stock. Also check whether customer-facing statements still describe the approved build. A wording change that broadens a performance or certification claim is not merely cosmetic, even when the physical product stays the same. This final consistency review keeps the purchasing decision, production identity and public claim aligned.
The decision log starts before approval
Ask the supplier for a change identifier, old and proposed configuration references, reason, affected models, intended introduction point, samples and qualification evidence. TI’s published PCN process is a useful primary-source example of reporting affected-product identity, impacts and qualification information. It is a semiconductor supplier’s process, not an automatic notice-period commitment by a charger manufacturer.
A substitute component should enter production only after its affected claims, evidence and lot boundary have an explicit disposition. Agree the notice and approval obligations in the commercial and technical documents; do not assume they follow from a generic claim of “equivalent material.”
Route the change to the right evidence owner
| Change category | Questions for engineering | Evidence to consider reopening |
|---|---|---|
| Power-stage or magnetic component | What electrical, thermal and safety assumptions change? | Applicable design assessment and affected qualified tests |
| Controller or firmware | Do profiles, port policy, recovery or protection behavior change? | Configuration capture and affected functional cases |
| Housing or thermal material | Do fit, heat paths, insulation or claims change? | Drawing review and relevant assessment |
| Connector or shipped cable | Do interface, rating or mechanical assumptions change? | Interface evidence and affected system cases |
| Label or artwork | Is this wording-only or a changed claim? | Identity, market and claim review |

Use change scope to select the evidence that must be reopened instead of either retesting everything blindly or approving solely on a matching part description. This table routes questions; it does not determine which safety or regulatory tests can be omitted. That decision belongs to qualified engineering and compliance reviewers.
Work a substitution through the log
Consider a hypothetical supplier request to replace a controller because of availability. The buyer records the old and proposed identifiers, the firmware relationship, affected SKU list and intended lot boundary. Engineering identifies the claims that might change, requests evidence and records the unresolved questions. Purchasing holds the affected release until the designated owners close those questions.
If the revised evidence supports only the single-port configuration, the multi-port claim remains open. If the supplier cannot identify which lots contain the replacement, document traceability as a separate gap even when the sample appears satisfactory. These are decision examples, not observations of a KEKU product or supplier.
Define what “approved” covers
Approval should name the configuration, evidence references, permitted deviations, affected claims, introduction point and reviewers. A conditional approval needs an expiry or completion condition and a clear restriction; it must not become an undocumented permanent exception. Retain the superseded evidence without presenting it as current proof of the new build.
Close the loop at the next shipment
Check that the delivered identity, documentation and agreed lot indicators match the approved introduction. Keep the first affected shipment separate in the records so an investigation can locate it later. If identity is uncertain, hold the traceability conclusion rather than inventing a serial-number range.
The objective is controlled evidence, not a promise of zero risk or guaranteed supply. Do not prescribe internal electrical modifications from a purchasing desk. Ask the responsible specialists to assess the change, then record exactly what their decision permits.
Related background: the broader OEM/ODM charging-accessories sourcing guide.